INCORPORATION OF NEW TECHNOLOGIES

NEW MACHINE FROM HOLZHER       For a better and quicker service, we have installed a new machine from HOLZHER, one of the latest generation that allows us to minimize our production times and to mechanize even more materials. It has a 3-axis numeric control with a [...]

2018-07-18T10:06:32+01:00

OUR NEW SHOP FITTING – MADRID AIRPORT T4

MADRID AIRPORT T4 Development, manufacturing and installation of perfumery at Madrid Airport T4 . The project includes: · Issey Miyake - Jean Paul Gaultier - Burberry | Back-Wall · Narciso Rodriguez – Elie Saab – Alaïa |Gondola

2018-07-18T10:06:34+01:00

OUR NEW SHOP FITTING – BARCELONA AIRPORT T1

BARCELONA AIRPORT T1 Design, development, manufacturing and installation. Three faces gondola, ELIE SAAB consists of richly lacquered shelfs with a unique combination of lit glass and simple chic drawer design system housing the “La collection des Essences” fragrances and discovery tools. Back-lit logos and mirror framed visuals take this [...]

2018-07-18T10:06:36+01:00
Go to Top